Solar power
Sell guarantees of origin
BKW offers voluntary remuneration for the guarantees of origin of your surplus solar power. Check whether your installation meets the requirements.
Complete HKN application
Aerial view of buildings with rooftop solar panels and green roofs in a landscaped residential area
Document origin
What is a certificate of origin?
A guarantee of origin shows where, when and with which technology electricity was generated.
A guarantee of origin (GO) is issued for every kilowatt-hour of electricity generated. In Switzerland, Pronovo is the accredited certification body. A GO is separate from the physical flow of electricity and can be traded as an independent certificate.
About Guarantees of Origin
Requirements
Can BKW take over your GoOs?
The offer applies to suitable photovoltaic systems in BKW’s supply area.
  • PowerYour system must be in operation, have an output of at least 2 kW and feed the surplus electricity into BKW's distribution grid.
  • "naturemade star"It must be eligible for «naturemade star» certification, must not have been commissioned before 2000 and must not be free-standing.
  • Plug & PlayPlug-and-play photovoltaic systems are excluded.
The feed-in remuneration compensates you for the surplus electricity that you feed into the grid. The GO remuneration is a separate, voluntary remuneration for the associated guarantees of origin. At BKW, it is credited on the bill together with the feed-in remuneration.About Feed-in Remuneration
Two workers wearing high-visibility vests install solar panels on a roof in front of a mountain landscape.
Registration
HKN offtake in three steps
From the inspection of your installation to confirmation of acceptance: how to register your guarantees of origin.
Quarterly submission deadlines apply to the start of acceptance. Please also factor in the registration and certification of your system.
01Check and register installationCheck all requirements for the acceptance of guarantees of origin. Register your photovoltaic system with Pronovo and have it certified. The specialist will submit the application to Pronovo. You can find the documents under forms at Pronovo.02Wait for activation and submit applicationPronovo confirms to BKW that your installation has been registered. You will receive a copy of the email with the subject “Activation of the installation for the issuing of guarantees of origin”. Only then can you assign the GOs and complete the GO application.03Confirm standing orderBKW pre-registers the standing order with Pronovo. You will receive an email from Pronovo and accept the standing order in the Pronovo customer portal within 30 days. This concludes the HKN contract; you do not need to sign it or send it back. BKW will send you the contract by email and a confirmation of admission. If the requirements and submission deadlines are met, acceptance will begin in the following quarter.
Register system with Pronovo
Frequently asked questions
What you should know about your GOs
Voluntary sale, remuneration and certificates explained clearly.
Guarantees of origin and fed-in electricity are not the same thing. The following answers will help you understand the offer.
BKW electricity customer support will help you further.